The Entryway Closet

Obviously I got off the blog writing wagon. We slowed down a bit on projects and fall is my favorite time to be out and doing all the pumpkin patches, carving, trails, etc. so I let the blog slip. Maybe I’ll get more consistent this year. Although it’s already January 6 and it’s my first post so don’t hold your breath.

In case you missed the post of what they entryway looked like before and my original thoughts, you can find that here. We stayed pretty close to the plan. I really wanted to add board and batten somewhere in the house. It’s a pretty common element in Craftsman houses, and I just like the way it looks.

The first step was clearing it out and adding the wall. Brandon and his dad worked on that over thanksgiving. The walls are boards from the barn my dad is tearing down. Brandon added a stain to them. They did the kitchen side boards first and we noticed the cold air coming through, so Brandon added a layer of insulation and two of plastic before putting up the boards on the closet side.

One layer of plastic, then insulation and another layer of plastic between the boards. There was a door here originally so that was easy to use as a brace for the boards.

Then of course the plaster needed to be repaired. There was a big hole and metal plate behind the freezer so even though that was going to be hidden by the plywood, he still patched it up. But he’s getting quick with plaster repair so not a big deal.

Now the measurements for where the vertical boards needed to go to be placed evenly was the biggest obstacle. We were both doing the math and neither of us are slouches in math, but it was not looking right. We found one website that was supposed to calculate it for you but it was off a bit. Brandon found a second that worked great. For the record, my math was only off by .1 of an inch. But that .1 of an inch makes a difference and is very visible.

We primed and painted in the basement then brought the pieces up. But Brandon wasn’t crazy about how the grain of the plywood was showing so he ended up sanding some parts down and redoing it. We were using the remainder of the paint I used in the guest room upstairs. I really loved that color and wanted to find another place for it, and I did! I think it looks just as good here.

Just placing them in the right spots.
All done!

We used the trim they was already there for the top. We then added some hooks that had been in the upstairs storage room. Some of you may recognize the bench from Brandon’s office in Macomb. I would like to put some peel and stick tile on the floor. These are my current favorites (#1, #2, or #3). Brandon likes the linoleum that’s there but it’s a little beat up. It’s not a big space and I’m not in any hurry, so I’ll update you when/if new tile happens.

The lights are heat lamps Brandon salvaged from one of the sheds. He’s added a motion sensor light. He only got one to see how it would work and it seems good to me, so we will get another one on our next Menards run.

And here’s a real life picture of the hooks doing their job with the girls book bags and coats. I’ll get a couple new bins for the bench and those striped baskets will be moved elsewhere soon.

It is 50/50 on Morgan hanging up her coat.
Real life. It may look pretty some day for an hour.

It’s really nice to have a spot for the bags and all the coats. If we are entertaining and it’s cold, there is an outlet we can plug in a space heater if necessary. Don’t worry, we will be safe with it!

Next up, I’ll be showing you the chandelier he built. It looks so good!

What’s been happening

Yeah, I totally dropped the ball on blogging last week. It was a busy week at work with some late night activities and meetings. Then I just didn’t have it in me to blog at night. Hopefully I’ll find a routine soon.

We have made progress on the floors downstairs. They are basically finished and ready for furniture to be moved in. We had to buy quarter round since it didn’t have any previously since there was carpeting. Brandon tried to get ahead of the game by staining it before we did the floors. Unfortunately they turned out lighter than the floors, so now he’s going to try to use tinted poly to go over them and match them better. I think the type of wood makes a huge difference in the stain application.

Brandon used an air hose to blow out all the debris from the space between the floor and baseboards. All the prep work of cleaning takes just about as long as the staining
We did a new technique for the downstairs. Brandon ended up wearing a mitt and applying the stain. I waited a couple of minutes for it to soak in, then wiped it off. This eliminated the blending issues we noticed on the upstairs floors. Which is exactly why we did the upstairs first. 🙂
This method was MUCH more labor intensive though. Brandon was on his hands and knees while I chose squatting and bending over. I’m not sure how much square footage it was but enough that we were glad to be done. I think it took about 3 hours.
The finished look is beautiful!

Now the issue is the baseboards. We are very tempted to strip and stain those because they have been beat up over the years. Luckily that is not quite as intrusive to living around as the floors. While the poly was drying, we were carrying our food outside around to the porch and piling up on our bed to watch movies for three days. But we won’t have to do that if we choose to do the baseboards. However, we will have to choose a stopping point with the doors and windows because if you give a mouse a cookie…we might end up with everything refinished.

We also have fit in some football games, birthdays, my first overnight work trip, petting zoo, face painting, watching prep work for harvest, riding 4 wheelers with cousins, fishing, and more. This past week flew by and Brandon is about to enjoy his last week off before starting at his new place. Glad we got the floors done before that. I mean there is still our bedroom and the small hallway, but that’s nothing compared to what’s been done. 🙂

(Aunt) Poly for the Finish

Fun side note: We finished up Peaky Blinders a week or so ago and like it a lot. Aunt Polly was one of my favorite characters, but not Brandon’s. This was also the second time we tried watching it. The first time we watched about 15 minutes and both said we couldn’t understand a word they were saying and stopped. Now, we are older and watch everything with subtitles so that wasn’t an issue. Turns out, it’s a great show.

Now, back to the floors. So once I was offered my new position and had a start date of early September, it kick started the need to finish the the upstairs’ floor. The ill-timed first bout of COVID that hit all of us but Natalie gave us an unexpected week off work, so we packed up on Wednesday and worked the next four days to get the floors stained.

The first things we had to do was do our best to eliminate all the dust. We went over the floors again with a broom, wiped down the walls and trim where a lot of plaster and sanding dust landed, and then wiped down the floors again with mineral spirits and tack cloth. It was amazing how much residue that combo cleaned up from the floors. Turns out there are a lot of uses for mineral spirits and if Bob Villa tells you to use it, it must be okay. 🙂

All cleaned up and ready for the next step.

Then it was time to stain. We went with Gunstock for upstairs. We started in the green room and I had a moment of panic when he started in the closet. It looked so much darker than our test patch in Morgan’s room.

See?! DARK!!! At this point I was wondering if we were going to have to sand it off and start again.

But I was patient and it turned out beautiful. It is darker than the test patch but it looks really rich and warm. When we started I was doing the edging and Brandon the main part of the floors, but we switched after a bit and stuck with me on the main part and Brandon the edges. Turns out, I have a good touch with the blending.

We had to pick some points for seams. So we taped it off and then once it was dry the other side was taped to not double up on the stain. I’m not sure if anyone else will be able to find them, but if you look closely enough, I’m sure you could.
Looking pretty! And not so dark!

So once the stain was on it had to dry at least 24 hours before we could start putting the polyurethane on it. And that was because we couldn’t walk on it before then. Brandon headed home before the girls and I, so I was able to check on it Sunday afternoon. It was still a bit tacky in spots which concerned Brandon when I reported it. He wanted me to wipe off the tacky spots so I started to do that, but quickly stopped. I felt like I was going to leave footprints and do more harm than good

And speaking of footprints, we were very careful to keep Clarence off the floors while we were staining, but Saturday night I had that instinct and asked if anyone had seen him. Nope, and I noticed the upstairs door was cracked. So I went up to investigate and there he was, looking at me through the banister. Luckily, he came right to me and I was able to smooth out the little paw prints he had made. He hadn’t had much time to explore, so I could reach all of them from the stairs. He is stealth-like, which is why he is such a good hunter.

So the next weekend we had a super busy Friday/Saturday, but Sunday was free, so we packed up late on Saturday night and were able to start covering the floors with poly by 8am Sunday morning. The first coat took us 1 hour and 45 minutes, but by the last coat, I had it done in 40 minutes. Each coat needed two hours to dry. We realized we didn’t have to be super careful about brush strokes like the stain. We finished up the 4th coat around 7:30 and jumped in the car to get back to Macomb since we both worked the next day.

I didn’t get a good picture of us putting the poly on, but it basically looked like we were pouring Elmer’s glue all over the floor and smoothing it out.
All shiny and pretty!

So the poly was able to dry a full week before we started moving in the next weekend. Now, the main floors. Then we can get the rest of our house moved. YAY!

All the trimming

One of the extra projects we didn’t really plan on doing originally was refinish all the trim in the downstairs. But while we were fixing the cracks and prepping to paint it was easy to see that the trim had not been protected the last time everything had been painted. (Neither had the baseboards, but it’s not as noticeable except in the dining room where we painted navy and the sloppy paint is a light color. We did a good job taping, I swear.)

So all the trim came down, was labeled and then refinished. To refinish it, Brandon used a Citrus stripper because it’s not as toxic. We could be around it with out worrying about breathing it in or getting it on ourselves too much. It says it works in like 2 hours, but Brandon left it on and wrapped it in plastic wrap for 24 hours. Two hours was not even close to having it stripped.

After it sat for 24 hours, we were able to wipe them off and then sand them down. Everyone got involved in that process.

This was a great project for the girls to help with.

You can see Morgan using the small wire brush. Those worked great to get in the crevices of the trim. Then for sanding these sanding blocks were helpful.

Then, much to Brandon’s relief, he tried just putting poly on the trim and it looked great. That meant no staining! It was pretty amazing how just the coat of polyurethane brought out the natural coloring of the wood. We think it’s red oak trim so maybe that’s why it looked so good.

See how pretty?! No staining, just poly (satin finish)

I did not take a great before picture of them, but trust me, they were splotched all over with paint. Once they were dry it was a matter of nailing them back up and we didn’t have any issues with that since we labeled and kind of kept them bundled by room throughout the process.

Much cleaner and not paint all over them.

I do need to touch up the painting in the rooms, but I’m hoping once we get furniture in the rooms, the baseboards and door frames with paint won’t be quite as noticeable. This was an easy project that made a big difference in my opinion but I was also up on the ladders with all those paint spots in my face. 🙂

Door #1 or Door #2?

In what I feel like is typical farmhouse fashion, there are multiple doors going outside. The “front” door that goes to the porch would never be used as the main door because there’s no parking near it or a sidewalk/path leading up to it. The west door is easier access to the shed and may be where we end up parking our cars, but the south door will be our main entrance for guests. (And let’s not forget about the outside basement door which allows you to head to the basement or into the kitchen. There are a lot of doors.)

The South door has a tiny porch that then leads to two doors. Now, for all the years I have entered this house, there was a chair in front of the door that is straight ahead and entered the house through the one to the left.

We (aka Brandon) might also build a slightly larger landing/deck outside this door sometime in the future. That’s one of those things we will live with for awhile and see if it really needs changed.
They both look pretty original to the house, so I still can’t figure out why there are two doors.

It was always a narrow walkway with the upright freezer, plus my grandparents had the house phone on the wall to the right so they had a small table with phone books, etc. below the phone. It’s was always a cluster at holiday/birthdays to zig zag your way to the left, then right and squeeze past the phone area.

This is the view from the kitchen. You can see the phone hookup at the top left, so imagine a small table sticking out into that already narrow hall, especially with the door frame there. So yes, there was another door at some point that separated the kitchen from that small area. Another porch/entry way?

I had always assumed the door that went straight into the house was stuck and couldn’t open. But then when we had my grandma’s 90th birthday open house my parents opened that door so people could walk right in the house. My mind was blown.

One of Brandon’s first comments about the house was “we have to do something about the entry”. I went back and forth with some ideas, one of which was opening the doorway to the kitchen so I didn’t fix a crack on that wall. I’m annoyed with myself with that decision now, but I tell myself it’s just part of the character of the house and shows the difference of a fixed/unfixed crack in the plaster.

This is the view from the dining room. See the crack on the wall on the right? Might be a good place for a mirror or picture. 😉

The game plan now is to wall off the old pathway to make an entry way closet for people to put their coats and purses and have some storage for our off season coats. I would prefer to remove the door that is on the porch to leave it open and not confuse people about which door they should choose. That wall area will also allow for an extra cabinet and a little more counter space in the kitchen, which is needed. We are using the door to go straight into the house and it’s been a hard habit for me to break after 40+ years. I immediately want to veer to the left.

Obviously the strapped freezer and little cabinet will get cleared out, so it will be a good-sized space for coats, purses and extra storage. It might be my place to add a board and batten wall which is a common feature in craftsman homes. It’s also easy and cheap to accomplish, so that’s a win.

So that’s the plan, but when that plan gets executed, who knows? It may be next month or next year. It’s on the list but it’s not a super high priority. It also sounds like one of the easier “big” projects, so we may be able to slip it in relatively soon. Floors are still the priority!

Refinishing floors is labor intensive

We (mainly Brandon) have been working to refinish the upstairs floors. Once all the painting was done, that was the next step towards being ready to move the girls’ furniture, books, and toys upstairs and be settled. We had a long weekend with the 4th of July so we thought we could get them sanded and prepped for stain, maybe even stained those days.

How the floors looked at the beginning of the weekend.

In order to prep the floors for sanding, I crawled over each board with a putty knife to locate any nails that either needed pulled up or pounded down. We also had to remove all the quarter round trim and those nails as well. And of course, lots of vacuuming and sweeping of dust from all the plaster repair work.

But our plans of sanding were quickly thwarted when the orbital sander continuously gummed up from the varnish. We had to get an orbital sander because the rental place with the belt sander was closed for the holiday. It was a long, frustrating day trying to figure out what our next steps were going to be. We tried using stripper to take the varnish off, but realized that was going to be way too labor and time intensive. We finally just had to give up the idea/goal of getting the floors sanded that weekend and regroup with different equipment on a different weekend.

This was after a quick pass. We tried to remove the gummy parts but it dried and hardened quickly. So salvaging the sandpaper was impossible.
The goop we were scraping off the floors when we attempted to strip it. What a mess.

So just this past weekend we were able to get a belt sander and it worked MUCH better. It was able to take the varnish up without gumming up. Brandon used a edge sander around the edges of all the walls which was not his favorite task. I used a scraper and mouse sander to touch up the corners. The green room’s closet was too small for the belt sander to get in, so we had to scrap up the varnish with a wire attachment on his cordless drill (we also did that along the walls). It was a very labor intensive project.

Once we had the first sanding done with the belt sander that was returned and he got an orbital again. It was easier to handle and got closer to the edges, so he went over the floor multiple times with varying grits of sandpaper to get a nice, smooth finish.

The natural look was pretty but ultimately decided to go with a stain.

The sanding took a full weekend of work. Now we are going to wipe down all the ceilings, walls and trim to eliminate as much dust as possible. Then go over the floors again to look for any gaps in the boards that will mess up the stain application. THEN we will be ready to stain. The three front runners are in the picture. The floors upstairs are pine and took these stains completely different from the oak floors downstairs. So we will be using two different stains. Then the poly coat will go on and cure for several days. It was definitely a good idea to start upstairs and get some practice in before conquering the downstairs.

Can you guess which one we chose?

Gutting the Bathroom

Where to start?

Where to start would be finding someone to work on it. Contractors are really booked right now from playing catch up from projects delayed by COVID. I would really like to get this project done before we moved in since it is the only bathroom in the house.

So you can kind of see the current layout. The sink is just peeking out from behind the door.

Layout

The current layout looks okay in that picture, but what you can’t see is the shower/tub is really narrow. What you can see is how the shower curtain is not vertical because of where the rod has to be placed due to the door and door frame. What that all means is you get “attacked” by the shower curtain. It only wants to suction to you and not hang like it’s supposed to. I thought about getting one of the curved rods to give more space for now, but I’m not sure it would work with the door opening. And the shower curtain would probably have to be longer to be effective. Another fun part of the bathroom and shower is the light switch is actually located IN the shower. Yeah, that wouldn’t pass any inspections these days.

So what I’m thinking might work is to move the shower over by the window (if we lose that window it’s fine with me), move the toilet where the sink is, and move the sink where the shower/tub is now. Currently across from the toilet is a linen closet, which is great. It provides lots of storage, so I’m hoping we will still have space for something similar.

The door swing may be changed to allow more room in the bathroom as well. It swings into the room now and that takes up a lot of potential space. I’ve also looked at a split door which may work, too. The square foot area of the bathroom isn’t terrible, but the layout doesn’t use the space as efficiently as it could.

What’s next?

Besides finding a contractor, the one thing we did do was pull up the carpet (yes, carpet) that was on the floor. It had been there a long time.

It makes it slightly better.

I think that the original floor was probably wood and was rotting since it is a bathroom and was wet a lot. Then they put another layer of wood on top because you can kind of tell in the picture that it’s not level with the floor in the hallway and the boards are going in opposite directions. Then when those boards started to rot (there’s evidence of that) they slapped some carpet on it and called it a day.

The walls are not drywall or plaster, but some kind of paneling. It is very rough. Every time Morgan has to take a bath she says “We’ve GOT to do something with this bathroom.” I swear she thinks we are just going to redo the rest of the house and leave what is probably the worst part as is. Oh, Morgan.

Colors and decorating

I have a color picked out for the walls. It’s a dark green. Not the same as the Green Room upstairs, but it may get changed to that because I like that color a lot. I think the bottom half or 2/3 will be either board and batten or a bead board that is white. That style goes with a Craftsman house and would look nice. I don’t have a picture of the medicine cabinet, but I plan to refinish that and use it above the sink.

So, stick around and see what actually happens with the bathroom. And when it happens since it might be more in the long-term than short-term.

Ceiling Fixes

Natalie’s Room

The Pink Room/Natalie’s Room had a basketball size piece of plaster that had fallen off the ceiling. Most likely due to water damage. Obviously, that was a main repair Brandon tackled first upstairs. The rest of the plaster on the ceiling and walls was in good shape except for the normal cracks. The closets in all the bedrooms upstairs were the worst for cracks. I think that was due to the angles and temperature fluxes in those areas.

The reason Morgan chose the room with the smaller closet. I guess she thought we weren’t going to fix it?

Just like with the cracks in the walls, this had to get worse before it got better. Brandon made the hole larger until the plaster was tight with the lath on the ceiling.

I’m pretty sure this was about his stopping point for making it larger.

After this point, he used some plaster to start mending the hole. The plaster was hard to work with because it set so fast. This was also one of the first projects he did. I’m guessing if he did it now, he would be much faster at applying the plaster. After one layer of plaster and sanding, I’m pretty sure he moved to mud for the next layer. I believe it took three layers before he was happy with the blending and sanding.

Checking out his handy work.

We have primed and painted it. You can’t tell it was ever there. And now Morgan is questioning her decision about room choice. 😉

Looks pretty darn good for his first ceiling plaster repair.

Morgan’s Room

The Blue Room/Morgan’s Room didn’t have a hole in it, but we could see where there was water damage on the ceiling and when we pushed up on the plaster, there was a bubble formed.

No hole, but still needed work.

Brandon really didn’t want to cut out the plaster (Natalie’s room was a lot of messy, dusty work looking up at a ceiling) so he researched ways he could repair it without cutting any out. I’m pretty sure this is the video he watched and read from on how to make the repair. He got two packs of these from Ace, not Amazon, though. 🙂

It is secured to the lath and ready for mudding and sanding.
This is from a different angle but you can see that it’s covered up and looks pretty good.

Green Room

Ugh, the green room. It (and Morgan’s room) had wallpaper. Didn’t really realize it until we started doing the crack repairs and it peeled. At first we weren’t that concerned about it. The girls had a blast using the various putty knives to peel it from the ceilings and the walls.

Besides throwing boxes over the banister, this was probably their favorite task.
Yes, Natalie was right up there helping to peel it off, too. Neither girls seem to have a fear of heights or ladders. The floor was COVERED with wallpaper shreds.

After we peeled off everything we could get with the putty knives, Brandon went over it with his sander to catch any other edges. Then did some mudding to remove any ridges. So we thought it was good to go for priming and painting. BUT when we started priming the ceiling (and the walls), that dang (keeping it PG here) wallpaper bubbled right up. It was frustrating and timewise a set back, but in the grand scheme of rehabbing an old house, not an expensive set back. So we got to get out the putty knives again and start Round #2. After that round of mudding and sanding, the prime did hold. There were a few tiny bubbles show up, but we looked the other way and kept on painting. I’ve painted over a lot of wallpaper and never had that happen when it’s felt so tight to the wall to begin with.

It’s Done and look at the “new” green in the green room. I LOVE it. I’m wondering where else I can put this color.

And to cap off the wallpaper issues, when we peeled off the tape on the ceiling to do the wall color, of course some wallpaper peeled off with it. So Brandon went around and had to touch it up in all the bedrooms. We are glad to be done painting upstairs!

Refinishing the floors

So obviously we were excited to find hardwood floors downstairs when we pulled up a corner of the carpet. We did that WAY before we had painted because we were curious. Considering the upstairs had hardwood, we were pretty sure the downstairs would as well. Although the upstairs is a wider plank and I think a different wood than is downstairs. I’ll try to get a better picture of the upstairs floors this weekend. They are currently covered in a lot of dust, so that may prove difficult.

Pulling the carpet

This part was fun for me and the girls liked it too. It was a big deal to get to the point where we could pull it up and get it out of the house. My lungs were really excited about it. Plus, it was fun to find out what was underneath that 50+year old carpet. Below is a link to a video of the girls pulling up the carpet.

https://www.youtube.com/shorts/7jXflUYWfHs

Then it was pulling up all the staples and tack strips. It’s a job I don’t mind at all. Morgan and I had a pretty good system for it, too. She would pop the staples up with a flathead screwdriver and I would follow behind and get them with the needle nose pliers. Brandon worked on the tack strips while us girls did the staples. Natalie floated in and out of both processes as 3 year old’s do.

Process that we will most likely follow

Once we got the carpet up, we could see that the floors would need refinishing. The living room has a rug-sized area that is a different stain than the rest of the floors. Plus the south facing windows in the dining room and office/computer room created some sun damage to the floors.

This shows the two different stains and the “rug” that was stained around.

We are going to start upstairs with the refinishing because neither of us have ever refinished floors so we want to start in the rooms where most people probably won’t see. So if we screw up it’s not at the front door when you walk in the house. I am hoping this weekend we get the rest of the upstairs painted, so we can start prepping for the refinishing. I know we will have to get all the quarter round off, which means we will have to label all of it and try to bundle it by room/closet. Then there’s the dust that will need vacuumed, mopped, and vacuumed some more before we even start sanding and creating more dust. We will be getting the ducts cleaned after all this dust has been floating around. 🙂

Brandon and I both have longer weekends over the 4th, so I am thinking we should be making good progress upstairs those days. Once that is done, I’m going to move the girls air mattress upstairs to get them used to sleeping upstairs and farther than a few feet away from us (at either house). I think that will be a major hurdle. I predict it will take a long time before they are sleeping in their own rooms upstairs.

Stain Color

Of course with all this progress on the floors means we need to choose a stain color. I’m pretty decisive when it comes to paint because I know that can be changed relatively easy in the future. But the stain color makes me a little nervous. It’s a big commitment. I don’t think I want to match the trim exactly due to the amount of red that is in the trim. I think that I want something slightly lighter and more neutral in color if that makes sense. So going back to the “rug” picture above, I want more of the rug color, less of the border color. Anyone have any thoughts on that issue? The built ins are even a different color than the trim, so I think it will be fine if the floors don’t match the trim.

Fun Side Projects

Some of the fun projects we have started.

Fixing up the house is a lot of fun, but so are the little side projects for decorating and furnishing the house and yard.

The yard is pretty much a blank canvas since my grandma gave up gardening several years before she passed. My plan is to use some of my dad’s old hog feeders as raised garden beds. We will take the top ring off and I think that will be about the right height. We’ve read where you can fill the bottom 1/3-1/2 with limbs and leaves to decrease the amount of soil you need to put in, so I think that is the current game plan. These will be on the south side of the house, between the driveway and the house.

Outside Projects

I think it will be as easy as removing a few bolts to get that top ring off. Then roll them to where we want them. We’ll see…

Then I wanted to add some play things for the girls outside but didn’t necessarily want one of the huge playsets, so I perused trusty Pinterest for ideas. There are a lot of tractor tires around, so I found this idea for a climbing tower.

This is the general idea. I think ours is slightly different with the pole placement. It currently looks a little bit like below.
Actually all four poles are attached now. Next we are going to have my dad lift if with his loader tractor so we can mark the spots in the grass where we need to dig the holes. We have to do that because the a couple of the poles are warped like you can see in the picture. Then we will take it all apart and spray pain the tires some fun colors and resemble. (Can you see the girls in the distance? They were playing safari in the tall grass. Morgan goes in barefoot, but Natalie prefers some footwear.)

We are going to stain the brackets on the roof. Brandon ventured out to make sure they were in okay shape and they seem to be. That will most likely include renting a boom truck so one of us can be lifted up to stain them on the sides of the house. But I think it will really make the “pop” and give some interest to a very white house.

Morgan really wanted to get out on the roof, but that was a hard no. It’s steeper than it looks.

Inside Projects

The next one is one I’m most excited about completing, but it doesn’t need to be done until we refinish the floors downstairs. It will be the lighting fixture for the dining room. Brandon has also found a lamp for the living room he wants to build and I’ll share that once we get closer to making it. Here is the inspiration.

I have glass insulators I purchased from my grandpa Tumbleson’s farm sale, so those will be used and the piece of wood is coming from a barn my dad is taking down on this farm.
You can see the lumber is attached to my SUV to be pulled out, but Brandon ended up cutting it and pulling it out himself. He has a few others to turn into shelves for the living room.
Here they are getting all sanded and ready to be stained. They look great!

There will be many more projects to come. Brandon’s currently reading this book to Morgan at night before she heads to bed, so who knows how many projects will come from there? 🙂